martes, 24 de abril de 2012

CLASE 4 SEMANA 4


Max= 20000*P1 + 30000*P2 + 51000*P3 + 62500*P4 + 68000*P5 + 1000000*P6;


0.5*P1 + 0.4*P2 + 0.7*P3 + 0.65*P4 + 0.45*P5 + 0.75*P6 <=   3;     
100*P1 + 200*P2 + 170*P3 + 250*P4 + 400*P5 + 250*P6 <= 1000;

p1+p4<=1;
p1+p3<=1;

@BIN(P1);
@BIN(P2);
@BIN(P3);
@BIN(P4);
@BIN(P5);
@BIN(P6);
LINGO:
Global optimal solution found.
   Objective value:                              1143500.
   Extended solver steps:                               0
   Total solver iterations:                             0


                       Variable           Value        Reduced Cost
                             P1        0.000000           -20000.00
                             P2        1.000000           -30000.00
                             P3        1.000000           -51000.00
                             P4        1.000000           -62500.00
                             P5        0.000000           -68000.00
                             P6        1.000000           -1000000.

                            Row    Slack or Surplus      Dual Price
                              1        1143500.            1.000000
                              2       0.5000000            0.000000
                              3        130.0000            0.000000
                              4        0.000000            0.000000
                              5        0.000000            0.000000

max= 5750*P1 + 11250*P2 + 8718.75*P3 + 8700*P4 + 6300*M1 + 10780*M2 +

9660*M3 + 10657.5*M4 + 5280*G1 + 8600*G2 + 7200*G3 + 10440*G4;

P1 + M1 + G1 <= 1;             
P2 + M2 + G2 <= 1;            
P3 + M3 + G3 <= 1;             
P4 + M4 + G4 <= 1;
P1+P2+P3+P4>=1;              
M1+M2+M3+M4>=1;
G1+G2+G3+G4>=1;
@BIN(P1);
@BIN(P2);
@BIN(P3);
@BIN(M1);
@BIN(M2);
@BIN(M3);
@BIN(G1);
@BIN(G2);
@BIN(G3);

Global optimal solution found.
   Objective value:                              37650.00
   Extended solver steps:                               0
   Total solver iterations:                             7


                       Variable           Value        Reduced Cost
                             P1        0.000000           -5750.000
                             P2        1.000000           -11250.00
                             P3        0.000000           -8718.750
                             P4        0.000000            1957.500
                             M1        1.000000           -6300.000
                             M2        0.000000           -10780.00
                             M3        1.000000           -9660.000
                             M4        0.000000            0.000000
                             G1        0.000000           -5497.500
                             G2        0.000000           -8817.500
                             G3        0.000000           -7417.500
                             G4        1.000000            0.000000

                            Row    Slack or Surplus      Dual Price
                              1        37650.00            1.000000
                              2        0.000000            0.000000
                              3        0.000000            0.000000
                              4        0.000000            0.000000
                              5        0.000000            10657.50
                              6        0.000000            0.000000
                              7        1.000000            0.000000
                              8        0.000000           -217.5000


martes, 17 de abril de 2012

TAREA SENTENCIAS

FRUTA:

MANGO:        Y1
MANZANA:   Y2
UVA:               Y3
PLATANO:     Y4
 1) SOLO ME COMPRO  MANGO Y MANZANA

Y1+Y3+Y4<=1
Y2=1
2)SI ME COMPRO MANZANA OBLIGATORIAMENTE ME COMPRO EL MANGO

Y2=Y1

3) SI ME COMPRO PLATANO YA NO ME COMPRO LA UVA NI LA MANZANA

Y4 + Y3 <=1
Y4 + Y2<=1

martes, 10 de abril de 2012

SEMANA 2 PROBLEMA 2

2.
producción. Hasta siete trabajadores pueden utilizar cada línea al mismo tiempo. A
los trabajadores de la línea de la producción 1, se les paga 500 dólares a la
semana y a los trabajadores de la línea de producción 2, se les paga 900 dólares a
la semana. Cuesta 1000 dólares preparar la línea de producción 1 para una
semana de producción, y 2000 dólares preparar la línea de producción 2 para una
semana de producción. En la tabla 12 se muestra el número de unidades de
pegamento que produce cada trabajador durante una semana en la línea de
producción. Cada semana hay que producir por lo menos 120 unidades de
pegamento 1, por lo menos 150 unidades del pegamento 2, y por lo menos 200
unidades del pegamento 3.
Glueco produce tres tipos de pegamento en dos diferentes líneas de
Formule un PE para minimizar le costo total para cumplir con las demandas
semanales.

PROGRAMACION ENTERA



martes, 3 de abril de 2012

EJEMPLOS DE PRE-REQUISITO

1.- PRIMERO RECARGA LA PISTOLA DE BALAS PARA PODER DISPARAR.

2.- PRIMERO DUERMES PARA PODER DESPERTARTE.

3.- RPIMERO COMPRA EL CARRO PARA QUE SEA TUYO.

4.- PRIMERO ACELERA PARA QUE AVANCE EL CARRO

VARIABLES

1.- ENTERA PURA:


2.- CONTINUAS:




3.- BINARIAS:






HERRAMIENTAS PARA LA TOMA DE DECISIONES

1.- VENIR TEMPRANO A CLASE.

2.- LEVANTARME TEMPRANO A ORDENAR MI CUARTO.

3.- COMPRAR MIS MATERIALES DE PROCESOS INDUSTRIALES 1 PARA LA PROXIMA SEMANA.